Monthly Archives: June 2014

A bit of steel, a lot of wood


To be able to finish installing the floor joists for the upper floor, a steel I-beam must be installed tying the timber structure into the block walls sitting on the concrete strip footings in the ground.     Meanwhile Jib (above) and … Continue reading

Posted in Uncategorized | 1 Comment

A bridge and a tank


Despite a fair bit of rain, a lot has been happening on site and this post, and the next, are overdue! Preparations begin on Day 53 (19 May) to kill a couple of birds with one stone. Access to the … Continue reading

Posted in Uncategorized | 2 Comments