-
Join 54 other subscribers
Recent Comments
dougacoop on Details, details: roof st… Ryan Hines on Details, details: roof st… Paul Balga on Days 93 and 94: roof on! Paul Balga on HOME MyrtleSt on Purlins, rafters and butterfly… -
Recent Posts
- Days 93 and 94: roof on! 2014/09/10
- Details, details: roof structure 2014/08/18
- Purlins, rafters and butterfly roofs 2014/07/19
- From this … to THIS 2014/07/07
- A bit of steel, a lot of wood 2014/06/02
- A bridge and a tank 2014/06/01
- Caring for trees 2014/05/22
- Interlude: Bella and the mountain dragon 2014/05/19
Archives
Meta
Daily Archives: 2014/05/19
Interlude: Bella and the mountain dragon
Yes, the last post did promise that the decision about the gum tree branch above the art studio roof-to-be would be revealed in the next post. But there’s time for that tomorrow. As promised in a reply to a comment … Continue reading
Posted in Uncategorized
2 Comments
Flooring installed – let the frames begin!
By the middle of Day 47 (Friday, 9 May), the lower floor of the main house has a surface and the team is moving rapidly to finish the art studio subfloor work and achieve the same there too. Two different materials are used … Continue reading
Posted in Uncategorized
6 Comments