Daily Archives: 2014/04/28

Days 31 to 37: path formwork and scaffolding


The project has arrived at a small fork in the road: to move rapidly ahead with scaffolding , which allows a start on the lower timber floor of the main house and the studio and their wall framing, or unusually, … Continue reading

Posted in Uncategorized | 2 Comments