Day 30: steel poles start!

The overall foundations really begin to take shape once the poles start getting welded in place. Your photographer got to the site too late to see the installation process but managed to see the amount of thought and concentration required – and some results.

Steel planning 49 DSC_0018

Terry (left) and Justin discuss their next moves

Excavator on upper block 49 DSC_0023

Meanwhile Jarrod moves some soil as part of the final excavation for the planter box, upper path and stairs down to the house. The background shows the work done to smooth the soil throughout the site and level some areas.

Steel poles 49 DSC_0021

These poles, less than half the required number for the whole project, will support the lower floor of the two-storey house.

This entry was posted in Uncategorized. Bookmark the permalink.