-
Join 54 other subscribers
Recent Comments
dougacoop on Details, details: roof st… Ryan Hines on Details, details: roof st… Paul Balga on Days 93 and 94: roof on! Paul Balga on HOME MyrtleSt on Purlins, rafters and butterfly… -
Recent Posts
- Days 93 and 94: roof on! 2014/09/10
- Details, details: roof structure 2014/08/18
- Purlins, rafters and butterfly roofs 2014/07/19
- From this … to THIS 2014/07/07
- A bit of steel, a lot of wood 2014/06/02
- A bridge and a tank 2014/06/01
- Caring for trees 2014/05/22
- Interlude: Bella and the mountain dragon 2014/05/19
Archives
Meta
Daily Archives: 2014/03/31
Day 3: pier hole putsch
By Day 3, Ian the builder and Darren the excavator operator describe the soil as ‘the worst we’ve ever seen’. Mostly ‘fill’ placed there to support the Woodcutters Road embankment when the road was built, it is full of small … Continue reading
Posted in Uncategorized
Leave a comment
Day 1: preliminaries over, excavation begins
With the 20-foot container for the site office and the temporary fencing in place, excavation begins March 6. Darren drove his 5-tonne machine over the edge and slowly and carefully cut across the steep slope making the upper path. Once … Continue reading
Posted in Uncategorized
Leave a comment